Remove Contract Remove Exterior Remove Permits Remove Zoning
article thumbnail

Columbia City Abbey Apartments by Allied8

Archinect

Several developers had attempted to redevelop the property, but failed on the hurdles of an old building, a strict zoning code, or a limited budget. Our research found that if we did not change the exterior massing (a hard sell for an architect!) In 2014, Allied8 was hired to breathe new life into this anchoring building.

Cities 130
article thumbnail

Columbia City Abbey Apartments by Allied8 | Apartment blocks

Architonic

Several developers had attempted to redevelop the property but failed on the hurdles of an old building, a strict zoning code, or a limited budget. Our research found that if we did not change the exterior massing (a hard sell for an architect!) In 2014, Allied8 was hired to breathe new life into this anchoring building.

Cities 94
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Basic Steps For Creating An ADU

Santa Cruz Architect

If you have an existing ADU that is not currently legally permitted, you may find that some of these steps may not apply to you as you go through the process of obtaining city approval and getting your ADU registered. For example, you may only find that you need to prepare a design and apply for ADU and/or building permit approval.

Permits 64
article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

This can establish “grandfathered” conditions that may apply to new project and impact planning and zoning calculations. South & West Proposed Elevations (555 Ocean Ave, Newport, RI) The next phase is known as “Bidding, Negotiation and Permitting.”

article thumbnail

WALA Refurbishes Federation-Style Bungalow Into Coburg Freeboard House

Architizer

The smaller courtyard, sandwiched between the period home and contemporary extension, becomes an interesting interstitial space that concurrently showcases the contrasting exterior skins. Our office was engaged for the design and permit approvals. Deep eaves are carved into the main exterior faces where sun-shading is most needed.

Housing 66
article thumbnail

LCC Health Professions Building

SW Oregon Architect

We organized the building’s layout, structural system, and exterior expression in accordance with the 40-foot grid that overlays the entire campus, an artifact of the mid-century planning principles that governed its initial form. Mahlum further broke the 40-foot grid down to three sections of 13’-4”.

Building 209
article thumbnail

Designing Your Rustic Farmhouse Style Barndominium

The Architecture Designs

This connection is forged not only through material choices and color inspirations but also through the thoughtful integration of exterior living spaces and the framing of nature’s vistas. Screened-in options can offer a bug-free zone, enhancing comfort during warmer seasons. Water conservation strategies are equally vital.

Design 52