Remove Contract Remove Estimating Remove Permits Remove Zoning
article thumbnail

Top 5 Dos and Don’ts: Impact of Homebuilding Budget on Cost and Quality

Design Thoughts Architects

Consider factors such as topography, soil quality, and accessibility when estimating the budget. Regulatory Requirements and Permits: Compliance with building codes, permits, and other regulatory requirements is essential. Elaborate designs, unique features, and intricate details may require higher construction costs.

Client 52
article thumbnail

LCC Health Professions Building

SW Oregon Architect

The HVAC design is comprised of a Dedicated Outside Air System (DOAS) with energy recovery and fan-coil units for zone heating and cooling. From the outset of their involvement at the beginning of Phase 2, the company provided invaluable cost estimating, value engineering, constructability review, and design coordination assistance.

Building 204
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Maryland's Key Bridge Response - A Story of Resolve, Achievement and Reverse Engineering

Community Architect

In addition, 553 contract specialists are actively involved in various roles related to dive, crane, and vessel operations. In addition, 553 contract specialists are actively involved in various roles related to dive, crane, and vessel operations. The estimate for the overall weight of the fallen bridge is 27,000 tons.

article thumbnail

Better Project Management for Small Firm Architects

EntreArchitect

When we receive a contract for a new project, we all want to jump right into designing. Estimate often. When we present our Schematic Designs we prepare rough, cost per square foot, cost estimates attached to each scheme. Systems allow us to be better architects. Know what they want, as well as what they don’t. Tweet This! ).

article thumbnail

Entrepreneur Architect Academy 012 | My 10 Rules for Better Project Management

EntreArchitect

When we receive a contract for a new project, we all want to jump right into designing. Estimate often. When we present our Schematic Designs we prepare rough, cost per square foot, cost estimates attached to each scheme. Systems allow us to be better architects. Know what they want, as well as what they don’t.