Remove Contract Remove Diagram Remove Site Remove Sustainability
article thumbnail

Competitions: International Competition for the development of the master plan for the "Adem Jashari" Memorial Complex in Prekaz, Municipality of Skenderaj, in the Republic of Kosovo.

Bustler

CONTACT E-MAIL: egzon.zariqi@rks-gov.net CONTRACTING AUTHORITY: MINISTRIA E KULTURES RS AND ÇJK PROJECT LOCATION: Prekaz, Municipality of Skenderaj, Republic of Kosovo TYPE OF CALL: Open Procedure ESTIMATED CONTRACT VALUE: 3,000,000.00 This Memorial Complex is the most significant site of memory in Kosovo.

article thumbnail

How to Grow a Greenway

Landscape Architecture Magazine

The city’s Department of Parks and Parkways had already cleared the site bordering the Tremé neighborhood, and staff from the New Orleans office of the landscape architecture firm Spackman Mossop Michaels (SMM) and a tree-planting nonprofit group had marked off where the 15-gallon, one-inch-caliper pond and bald cypress were to go.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

This includes the selection of the architect and a feasibility study analysis of the site. Proposed Site Plan (555 Ocean Ave, Newport, RI) If there is an existing building, even if that building is to be demolished, a careful survey of the structure is generally undertaken.

article thumbnail

The Best Architect Exam Prep Resources

The Architect's Guide

and covers recent developments in project delivery, sustainable design, pre-construction activities, and many other areas of architectural practice. Project Planning & Design (PPD) is an exam that tests your ability to design sites and buildings. It includes subjects that are new to ARE 5.0 in all 6 divisions.

article thumbnail

U Farm | Urban Farming Center

ArchiDiaries

The centre must be designed keeping in mind the local constraints of the site. Context: The design must respond to the (existing) site conditions. Sustainability: Reduce the negative impact of design on the environment, by improving building performance, reducing waste and ensuring comfort for occupants. Design objectives.

article thumbnail

Peak | Ideal Neighborhood

ArchiDiaries

Peak, a challenge is to generate renders for an ideal living neighborhood that will focus on connectivity, transportability, self-sufficiency and sustainability. Sustainable energy (environmental technologies, zero emissions, renewable). The site for the neighbourhood must be restricted to 12,000 sq.m Circular Economy.

article thumbnail

Ohana | Flood Resilient Neighbourhood

ArchiDiaries

The neighborhood will be built on an at-risk site in a coastal city. The design must respect the existing site features and topography. The neighborhood will be built on an at-risk site in a coastal city. The design must respect the existing site features and topography. . Site area = 15,292 sq.m. OBJECTIVES.