Remove Contract Remove Contractor Remove Permits Remove Schematic Design
article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

These may be done with simple hand sketches, Sketch-Up models or even Computer Assisted Design (CAD) drawings, but they will tend to be very diagrammatic and simple. Sometimes during the Schematic Design phase, several or even many alternative approaches are created for the client’s review and comment.

article thumbnail

Becoming an Architect: What You’ll Need to Know

Young Architect

Reviewing the work of contractors, so they can get paid, . Sure, sometimes designing and drawing pretty pictures are part of an Architect’s day, but that’s really just a very small piece of every project. After we solved the design problem, the next 11 months were spent… . lots of AIA Contracts and closing out a project. .

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LCC Health Professions Building

SW Oregon Architect

Fortis Construction is the Construction Manager/General Contractor (CM/GC) for the project. From the outset of their involvement at the beginning of Phase 2, the company provided invaluable cost estimating, value engineering, constructability review, and design coordination assistance. Rendering of the proposed multipurpose classroom.

Building 205
article thumbnail

Better Project Management for Small Firm Architects

EntreArchitect

When a process is fully developed into a system with supporting documents of forms and checklists, it allows us to focus more on the details and development of a successful design. When we receive a contract for a new project, we all want to jump right into designing. Build rapport with the contractor.

article thumbnail

Entrepreneur Architect Academy 012 | My 10 Rules for Better Project Management

EntreArchitect

They may be documented as formal systems or they may just be a general understanding of “how we do it here” When a process is fully developed into a system with supporting documents of forms and checklists , it allows us to focus more on the details and development of a successful design. Build rapport with the contractor.