article thumbnail

Zaha Hadid Architects completes dune-like Beeah Headquarters in Sharjah

Deezen

"With their new headquarters, Beeah demonstrates how technology can scale sustainable impact and ultimately serve as a blueprint for tomorrow's smart, sustainable cities.". It is clad in glass fibre-reinforced concrete. Sustainability consultant (construction stage): Buro Happold. Main contractor: Al Futtaim Construction.

Architect 145
article thumbnail

Redefining Commercial Spaces: Trends in Modern Workplace Design

The Architecture Designs

Innovative Materials and Construction Techniques for Modern Workspaces The use of innovative materials and construction techniques is pivotal in creating modern workspaces that are aesthetically pleasing, environmentally sustainable, and safe.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Caisse d’Epargne Bourgogne-Franche-Comté Headquarter // GRAAM

Architizer

The building is designed with a wooden structural skeleton, a prefabricated concrete floor, an exo-wooden structure covered with a glass double skin. Built to a high thermal standard (passive building), it is also designed so that natural light spreads over all the workstations, ensuring excellent quality of use. © GRAAM.

article thumbnail

BEEAH Group’s new headquarters by Zaha Hadid Architects

aasarchitecture

Glass reinforced fibre panels reduce solar gain while slab and glass cooling regulate interior temperatures for optimum comfort. On-site water treatment filtrates waste water to minimise consumption and its solar farm charges Tesla battery packs to meet the building’s energy demand throughout each day and night.

article thumbnail

Sub-Centre Library, Beijing China

e-architect

Sub-Centre Library, Beijing Smart Building Development, China, Chinese Architecture, Architect, Design Images. Construction started in 2020 and since then, the roof has been put in place and the tall glass enclosure, up to 16 meters, is currently under installation. Status: Under construction. 17 Jan 2022.

Roofing 76
article thumbnail

BEEAH Headquarters by Zaha Hadid Architects

aasarchitecture

Glass reinforced fibre panels reduce solar gain while slab and glass cooling regulate interior temperatures for optimum comfort. On-site water treatment filtrates waste water to minimise consumption and its solar farm charges Tesla battery packs to meet the building’s energy demand throughout each day and night. The 9,000 sq.

article thumbnail

De Jakoba by Studioninedots

aasarchitecture

Making use of form and smart building methods, we realised a powerful and qualitative building: a recognisable place where people live with pride and are willing to take care of. The open communal garden and high multifunctional spaces at the ground floor along Docklandsweg bring new vibrancy at street level.