Remove Commercial Remove Diagram Remove Innovation Remove Regulation
article thumbnail

Deconstruction by Design: How Architects Are Redefining Practice Through Material Reuse

Architizer

Breaking Ground: Creative Approaches to Construction Waste Diagram illustrating the winning entry for an architecture competition held by Hackney City Farm, showcasing the repurposing of sash windows. Mock-ups, often made of high-end materials, are typically discarded after reviews, resulting in significant waste.

article thumbnail

University of Southern California presents 10 architecture student projects

Deezen

This change, as seen from a top-down perspective within the supply chain, could include material substitutions, technology innovation and implementation as well as an independence from non-renewable energy sources. I began by acknowledging that current architectural education and practices remain strictly within regulated parameters.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Competitions: 2022-2023 Moganshan Town · Fuxi River Seven Bridges Conceptual Design International Competition

Bustler

Fuxi River Seven Bridges Conceptual Design International Competition is one of the important starting projects of Moganshan Fuxi Water Street Commercial Complex. The forward-looking, innovative and diverse conceptual designs will be collected from architecture, landscape, bridge and art fields. Submit all drawings and text online; 6.

Diagram 40
article thumbnail

Competitions: Design Competition of International Islands and the Future Residence

Bustler

The market-centered commercial housing project, plot code JDGJ-03-D05, is located in Jiangdong New Area, Haikou City, bordering Zhenhai Four Heng Road on the west and Haikou Yanlord Gardens on the south. For detailed regulation conditions, please see competition documents – site planning and su file) Design Requirements.

article thumbnail

The Importance of Planning

DesignScape Architects

Planning is done in numerous stages – from schematic diagramming to final tender plans. Schematic diagramming’ refers to the process in which architects analyse the conditions of the site, and the client’s brief, and loosely organise the building’s functions and services into a rough plan drawing.

Diagram 40
article thumbnail

140+ Software Tools for Architecture Firms [2020 Update]

Architecture Quote

ArchitectureQuote helps innovative SME architecture firms discover and win more projects. It is a great digital tool for architects as the platform provides a high focus on continuous innovation and personal customer service to each client. Free to use for personal and commercial use and no bond to copyrights. ArchitectureQuote.

article thumbnail

Architecture Market Analysis Report

Architecture Quote

Foreign players with special competencies and innovative, efficient building methods are particularly welcome and stand an excellent chance of winning business. Fiscal policy is at the center of Denmark’s economic activity with regard to regulating inflation. Economic Factors affecting Danish market. Austrian Architectural Market.