Remove Clients Remove Construction Remove Diagram Remove Site
article thumbnail

Junya Ishigami 'excavates' concrete cave for restaurant and residence in Japan

Archinect

Asked by the client for a space that "has to look as if it has been there and will continue to be there for the longest time," Ishigami responded with a cave-like structure punctured by three courtyards. Concrete was then poured in situ and the surrounding earth excavated further to reveal the final form.

Diagram 299
article thumbnail

Construction of 10 Design’s Nanjing Dajiaochang Airport Mixed-Use Development is in full swing

aasarchitecture

After won an international design competition to transform the 243,768 sqm historic military airbase site into a contemporary mixed-use project, now 10 Design continues construction. With two underground railway stations embedded into the site, connectivity is one of the key design drivers.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Taiping mixed use development by Peter Pichler Architecture

aasarchitecture

aran, Silvana Ordinas Client: Keycity Group Project GFA: 100.000 m2 Year: 2022 finish construction Images: Courtesy of Peter Pichler Architecture. Section.

article thumbnail

Break Ground of Zoomlion Headquarters by HENN

aasarchitecture

The new industrial park will drive innovation in the field of construction engineering and usher in a new era of intelligent, digital and green construction. This new ground plane traverses an irregularly sloped site and spans a busy motorway to create seamless connections between the north and south sides of the site.

Diagram 97
article thumbnail

Daniel Joseph Chenin, Ltd. Construct Fort 137 Featuring Unobstructed Views of the Surround Desert and Canyons

Architizer

Fort 137 – The clients sought an environmentally conscious home with a direct relationship to its site to function as a base camp for their active lifestyle. Rocks excavated from the site were used so that the building blends into the ecology while minimizing waste. Project Status: Built. Year: 2021. © Stetson Ybarra.

article thumbnail

ID origins by Studio Symbiosis

aasarchitecture

The new façade of the project creates a locus for the site, and acts as a visual marker for the entrance to the overall site, which spreads over 12 acres of land. In the dense urban fabric of Mumbai, the project will be visible from pedestrian as well as vehicular routes, making the site experience more coherent.

Diagram 98
article thumbnail

Peeking Through Trees by Next Architects

aasarchitecture

The 26-metre high wooden construction also provides a habitat for the various bat species present in the area. The site is located along the flight route of bats and is therefore perfectly suited to accommodate a range of different bat species.