article thumbnail

Land Morphology and Olson Kundig update Oregon botanical garden

Deezen

The aerial path rises above the ground Later phases of work will entail the creation of six display gardens and further installations. In addition to Olson Kundig, Land Morphology worked with a dozen speciality consultants, a 14-person community advisory committee, the City of Portland and a group called Leach Garden Friends.

article thumbnail

Ten buildings that became embroiled in legal battles

Deezen

Although Calatrava maintained that the glass paving originally installed complied with regulations and had by signed off by local authorities, the court accused him in 2019 of "gross negligence" during the design of the bridge and fined the architect €78,000. Construction was completed later that year with no changes to the number of storeys.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Role of Architects in Construction Projects

Santa Cruz Architect

Architects visualize the whole building structure, bringing creative designs and ideas to the construction industry, but these also require an underlying structural design and MEP installations. Main Differences Between an Architect and an Engineer. The difference is reflected on the main goal of each professional: 1.

article thumbnail

How to Utilize Aluminum in Modern Construction Projects

Architecture Ideas

Civil engineers frequently use aluminum ingots and billets in processing windows, stairs, roof sheets, floating ceilings, doors, wall panels , and much more. The characteristic allows more glass usage, which permits more sunlight into the building, making it conducive for people to work with natural light.

article thumbnail

Kongjian Yu: Found In Translation

Landscape Architecture Magazine

The translation of Yu’s celebrated Big Foot design principles to the site’s diminutive footprint demanded some concessions, namely in the type of plants permitted by Seattle Parks and Recreation to meet security and maintenance requirements. “In The gate remains a polarizing feature, even after installation.

Safety 85
article thumbnail

University of Arkansas Community Design Center Proposes Downtown Housing Regeneration Scheme

Architizer

Since installation of costly underground stormwater drainage was not an option, we organized housing pockets around urban spaces that are “rain terrains” Rain terrains manage and treat water on site rather than drain water downstream, where it becomes someone else’s problem. Stephen Luoni & Steven L.

Housing 61
article thumbnail

Behind The Design 003: Canal House by The Ranch Mine

EntreArchitect

MPE Engineer, Structural Engineer, and Civil Engineer. Lump sum is our preferred fee structure made payable in 4 installments. What was the process for permitting? We submitted the plans and permitting took about 2 months, a pretty standard timeline for the City of Phoenix. Phoenix, AZ. Consultants.

Mining 52