article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. "We hope this project will enhance urban spaces in the city, contributing to the State of Texas' and Austin's unique, vibrant identity." & Elec.

Utilities 113
article thumbnail

Diller Scofidio + Renfro creates performing arts centre on Massachusetts campus

Deezen

Acoustics & audio/visual: Jaffe Holden. Civil engineer: Nitsch Engineering. Cost estimator: Dharam Consulting. Project credits: Design architect: Diller Scofidio + Renfro, (Partner-in-Charge: Charles Renfro). Executive architect: Perry Dean Rogers. Contractor: Dimeo Construction. Geotechnical: Haley Aldrich.

Art 106
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Prior Performing Arts Center at the College of the Holy Cross by Diller Scofidio + Renfro

aasarchitecture

The 84,000-square-foot, $110-million facility is designed by New York-based Diller Scofidio + Renfro (DS+R), a renowned design studio whose practice integrates architecture, the visual arts, and the performing arts. The building is named for lead donor and alumnus Cornelius B.

Art 52
article thumbnail

Henning Larsen creates gridded facade for Minneapolis Public Service Building

Deezen

Just beyond the entrance, a wide, open staircase helps establish an inviting atmosphere and is meant to be visually linked to activity on the street. Structural engineer and security consultant: Buro Happold. Mechanical and electrical engineers: Buro Happold. Plumbing and fire protection engineers: Obernel Engineering.

article thumbnail

5 Most Common Mistakes To Avoid When Renovating A House

Architecture Ideas

It is, therefore, worthwhile to consult an architect or civil engineer and to use his expertise for construction supervision. Disability or age-related restrictions will make life easier for you with a floor-level shower, the removal of thresholds, a suitable visual mark on the steps or a wheelchair-accessible vanity unit.

article thumbnail

I’m a Jack of All Trades and a Master of None

SW Oregon Architect

Effective generalists are strategists who visualize the big picture and approach solving problems from that perspective. Accordingly, it is not unusual these days for the demands of a project to require a large and diverse group of specialists to complement the architect’s limited skillset.

article thumbnail

Explorers at Home

Landscape Architecture Magazine

In silhouettes, the Tree Walk’s black steel piers, railing, and deck edges differ not much from the visual patterns of the forest. Electrical Engineer Reyes Engineering, Portland, Oregon. Civil Engineer Janet Turner Engineering, LLC, Lake Oswego, Oregon. Structural Engineer Lund Opsahl, LLC, Seattle.

Home 86