Remove Civil Engineering Remove Estimating Remove Structure Remove Transportation
article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. The map denotes near-term developments in orange and long-term developments in the lighter peach shade. & Elec.

Utilities 118
article thumbnail

Land Morphology and Olson Kundig update Oregon botanical garden

Deezen

The pavilion is an open, roofed structure with slatted wooden walls New additions include an event pavilion, an aerial tree walk and three "botanic collections". The pavilion, dubbed the Fireside Terrace, is an open, roofed structure with slatted wooden walls. Designed by Olson Kundig, the structure overlooks a pollinator meadow.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Student Performing Arts Center by Steven Holl Architects

aasarchitecture

Model Location: Philadelphia, USA Architect: Steven Holl Architects Project Team: S teven Holl (design architect, principal), Noah Yaffe (partner in charge), Wenying Sun (project architect), Ruoyu Wei, Michael Haddy, Yasmina Parto, Yaunchu Yi, Dimitra Tsachrelia Structural Engineer: Silman MEP engineer: dbHMS Civil Engineer: Hunt Engineering Company (..)

article thumbnail

Henning Larsen creates gridded facade for Minneapolis Public Service Building

Deezen

Structural engineer and security consultant: Buro Happold. Mechanical and electrical engineers: Buro Happold. Plumbing and fire protection engineers: Obernel Engineering. Civil engineers: EVS. Vertical transportation consultant: Lerch Bates. Cost estimator: Faithful & Gould.

article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

The plan also outlines schematic design for site improvements and infrastructure, such as all utilities for future phases, stormwater management, parking, and new structures, which include restrooms and a fireside terrace used for events. The Fireside Terrace is an open structure with a solid roof with views out to the tree walk.

article thumbnail

R architecture Creates Flexible Design for the P+R Car Park

Architizer

Also the large spans and the structure pushed back to the periphery never hinder the parking spaces and circulations. The structural feat for a simple building approaching a civil engineering work, pushes the limits of the concrete with 16m crossing spans and a double helix made of 2 cantilevered ramps. © R architecture.

article thumbnail

Explorers at Home

Landscape Architecture Magazine

Prosper Portland, an economic development agency, gave $2 million, and Portland Metro, the transportation agency, made a $188,000 grant. They’re to be built in future phases and are suggested as calm shedlike structures framed in fir and clothed in cedar lath. Electrical Engineer Reyes Engineering, Portland, Oregon.

Home 87