article thumbnail

Chuckanut Bay Rugby by Graham Baba Architects

aasarchitecture

Image © Graham Baba Architects Recognizing the importance of developing the site to meet the needs of a growing club and sport in the U.S., volunteers and club members pulled together and regraded, irrigated, and actively maintain the most immaculate natural rugby grounds in the Pacific Northwest in preparation for the new development.

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. Read: Oman announces plans for mixed-use district in Jabal al Akhdar mountains The connections provide a way for the city's development to recognize the past, while leaving space for future expansion.

Utilities 117
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Fast Tracked

Landscape Architecture Magazine

To meet the ambitious climate targets ahead, designers, developers, and construction firms need common standards. Reporting methodologies can vary based on the unit of measurement, estimated project life span, or how a project’s area is defined. By Timothy A. Image courtesy Climate Positive Design.

article thumbnail

University of Arizona Health Sciences Innovation Building // CO Architects

Architizer

The Center for Advanced Technologies in Healthcare unites the health professions disciplines, engineering, behavioral sciences, information systems and others in multidisciplinary research and development endeavors. CO Architects: Executive & Design Architect; Swaim Associates: Associate Architect.

article thumbnail

Dairy Apartments Portland, Oregon

e-architect

Currently under construction, this residential property project’s estimated completion is March 2025. The resulting design includes two 7-story housing bars on a full-block, 2-story podium arranging ground-floor residential and amenity spaces around a central private courtyard.

article thumbnail

Hunters Point Substation by TEF Design and Tatiana Bilbao Estudio

aasarchitecture

The project is part of a broader development that includes several planned parks and trails. The client asked the design team to develop the substation to improve the reliability and resilience of the electrical grid and foster a tighter knit community. Project completion is estimated for Fall 2023. and ACG Engineers Inc.

article thumbnail

Leach Botanical Garden by Land Morphology

aasarchitecture

In addition to a series of new dynamic gardens, the project includes the infrastructure for future garden development and an eventual new administrative building and lecture hall/common use space. Implementation of the first phase of a twenty-year Master Plan of Leach Botanical Garden is now complete.