Remove Civil Engineering Remove Construction Remove Estimating Remove Transportation
article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. The project was created to "cultivate a stronger sense of community" Currently under construction, Phase 2 utilizes Page's master plans with final architectural designs by HOK. & Elec. (AOR

Utilities 119
article thumbnail

Land Morphology and Olson Kundig update Oregon botanical garden

Deezen

In the second half of the 19th century, it became part of a sawmill that provided lumber for the construction of homes in Portland, according to the design team. It was long used as a hunting, fishing and camping site by native people.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Student Performing Arts Center by Steven Holl Architects

aasarchitecture

The Student Performing Arts Center is expected to begin construction in fall of 2024 with anticipated occupancy in winter 2027. The new Center continues Steven Holl Architects’ portfolio of performing arts and cultural venues that serve as community gateways.

article thumbnail

Henning Larsen creates gridded facade for Minneapolis Public Service Building

Deezen

Other projects by Henning Larsen include an opera house in Hangzhou that resembles an iceberg and The Wave housing complex in Denmark that was under construction for 11 years. Plumbing and fire protection engineers: Obernel Engineering. Civil engineers: EVS. Vertical transportation consultant: Lerch Bates.

article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Work is organized into three principle activities: 1) Design Development and Entitlement Processes ; 2) Site Development Permits and Construction Documents for Upper Garden Development ; and 3) eighteen months of construction. The first phase is approximately seven acres.

article thumbnail

R architecture Creates Flexible Design for the P+R Car Park

Architizer

Here we have attached as much importance to spatial and constructive rationality as to the quality of the spaces produced. The structural feat for a simple building approaching a civil engineering work, pushes the limits of the concrete with 16m crossing spans and a double helix made of 2 cantilevered ramps. © R architecture.

article thumbnail

Explorers at Home

Landscape Architecture Magazine

And it was Heller, someone you can tell greets a design or construction problem like a red cape, who ran the layers, megabytes, and muscle of detailing and getting phase 1 of the Leach overhaul built. million from fees developers pay for new construction. Electrical Engineer Reyes Engineering, Portland, Oregon.

Home 86