Remove Architecture Student Remove Contract Remove Sketching Remove Students
article thumbnail

MUSCAT & MORE

Shades of Grey

Sometimes I'm involved all the way through to contract documents but more often I will move on to a new project around the end of Schematic. Not sure what to say about this sketch, which I think I captured with my first digital camera when I was preparing to move to Dubai. I understand why, but doesn't mean I think it's the best way.

article thumbnail

Life of an Architect – Best of 2014

Life of an Architect

The soil in my area of practice tends to be expansive because it contains a healthy dose of clay, which expands and contracts as moisture enters the equation. Remove water due to hot and dry conditions, and the soil contracts. This doesn’t mean that everyone who graduated in my era could sketch – far from it.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

100 Women to Watch in Architecture

Architizer

While this represents progress, both gender and racial inequality and discrimination remains widespread in the architecture industry , from student bodies and educational institutions right through to professional organizations and the workplace as a whole. Left: ARE Sketches Volume I; right: Lora Teagarden. Anna Maria Bordas.

article thumbnail

Letters of an Architect: Lessons from my Best Projects

Community Architect

Front of the school facing Bismarck Strasse (School website) The architectural project with all these features came to my mind when I was wondering which of the projects I have under my belt as an architect could still resonate with the students that I, at times, try to teach one thing or another. Let me explain why.

Project 81