Remove 2028 Remove Art Remove Concept Remove Technology
article thumbnail

Onboard Explora Journeys’ first ‘floating luxury hotel’

Hotel Designs

Here are his thoughts on the whole luxury ‘suites at sea’ concept… Somewhere in the North Sea, lost within a wilderness of vast, deep water that stretches out as far as the eye can see, Explora 1 carves through the waves and breaks new ground in maritime history. What’s onboard?

Concept 97
article thumbnail

Homes of the Future, The Rise of 3D Printed Houses

Arcmax Architects

billion by 2028, with an impressive CAGR of 21% in the next 7 years. Aside from most people being familiar with smaller-scale 3D printing machines producing art and jewelry, the industry ’ s growth can be greatly attributed to its industrial applications in the fields of medicine and manufacturing. . The Key to Low-cost Housing.

Home 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

On the Future of Cities

A Daily Dose of Architecture Books

The chapter in the earlier book includes, among other projects, the Lincoln Square Special Zoning District, created in the wake of construction of Lincoln Center for the Performing Arts and developers rushing to build near it. The last is now just partially built out, about 25 years after Barnett was brought in.

Cities 52
article thumbnail

Diagonal by Pininfarina Fortaleza apartments

e-architect

Our goal was to bridge the past, present, and future of the bustling community with an engaging concept that fosters interaction, reinforces connections to nature, and champions sustainability from the inside-out.” Diagonal by Pininfarina is slated to start construction in September 2023 and estimate to be completed in September 2028.

article thumbnail

Vilhelm Lauritzen Architects Designs Impressive and Efficient Copenhagen Airport Extension Pier E

Architizer

Architizer: What inspired the initial concept for this design? With this design concept, we balanced rationality and an efficient form of “hygge” with a strong materiality approach relating to our legacy of buildings at Copenhagen airport. Terminal 3 Expansion is expected to be completed in 2028, with an extension of 80,000 m2.