Remove 2026 Remove Landscape Remove Structural Engineering Remove Structure
article thumbnail

Tree planting ceremony marks start of construction on MVRDV’s La Serre

aasarchitecture

This 18-storey rack filled with greenery, housing units and shops is a result of collaboration between MVRDV, landscape architect Alice Tricon and developer OGIC, aiming to create a biodiverse haven challenging traditional apartment living.

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

It includes two new high-rise office buildings that measure over one million square feet (92,903 square metres), a central utility plant for efficient cooling and a five-storey, below-grade structure with over 3,000 square feet (280 square metres) of parking space. & Elec.

Utilities 112
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Fulldraw Vineyard by Clayton Korte

aasarchitecture

Photo © Likeness Studio The 12,620-square-foot winery complex consists of three buildings: a 6,972-square-foot Fermentation Building and Barrel Aging and a 2,170-square-foot Case Good Storage area, plus a second phase hospitality building that should be complete by 2026.

article thumbnail

Opticum Research Building by HENN

aasarchitecture

Second Floor Plan Its clean structure is complemented by staggered vertical solar control louvers that create a playful rhythm. On the first and fourth floors dark façade elements frame the shimmering reddish curtain wall on the floors in-between, whose warm shades correspond to the façade at the building’s base level.

article thumbnail

Issy La Serre by MVRDV

aasarchitecture

This 18-storey rack filled with greenery, housing units and shops is a result of collaboration between MVRDV, landscape architect Alice Tricon and developer OGIC, aiming to create a biodiverse haven challenging traditional apartment living.

article thumbnail

Minerva House extension by Ben Adams Architects

aasarchitecture

The project will start on site in 2023 with completion expected in 2026. Source by Ben Adams Architects.

article thumbnail

PES-Architects wins design competition for Ferry Terminal Turku

aasarchitecture

PES-Architects’ design was unanimously selected for best fulfilling the competition goals in terms of functionality and fit in the environment and landscape of the evolving Linnanniemi area, by the historic Turku Castle. The goal is to have the new passenger terminal in use by early 2026. Image © PES-Architects. Image © PES-Architects.