Remove 2026 Remove Engineering Remove Landscape Remove Structure
article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

It includes two new high-rise office buildings that measure over one million square feet (92,903 square metres), a central utility plant for efficient cooling and a five-storey, below-grade structure with over 3,000 square feet (280 square metres) of parking space. & Elec. (AOR & Elec.

article thumbnail

Henning Larsen unveils design for world's largest timber logistics centre

Deezen

Trees will provide shaded seating on the roof Expected to be completed by 2026, the Logistics Center West will be built largely from glued laminated timber (glulam) and cross-laminated timber (CLT) along with other biogenic materials. Henning Larsen is an international studio for architecture, landscape, and urbanism.

Roofing 123
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Opticum Research Building by HENN

aasarchitecture

This is where researchers and lecturers from the fields of physics, mechanical engineering, electrical engineering, mathematics, computer science, and chemistry will work together on developing and further advancing optical technologies, such as those used in smartphone cameras, for online streaming through fiber optics, and in 3D medical imaging.

article thumbnail

Jones Studio designs education centre to show "preciousness" of water in Arizona

Deezen

As part of the proposal, the team has planned exhibitions for the centre that will illustrate the waterways and "engineering marvels" that bring water to the Southwest. On the north side of the canal, a community gathering space placed under the solar panel-covered metal canopy will look out on a preserved desert landscape. "It

Education 134
article thumbnail

Fulldraw Vineyard by Clayton Korte

aasarchitecture

Photo © Likeness Studio The 12,620-square-foot winery complex consists of three buildings: a 6,972-square-foot Fermentation Building and Barrel Aging and a 2,170-square-foot Case Good Storage area, plus a second phase hospitality building that should be complete by 2026.

article thumbnail

Issy La Serre by MVRDV

aasarchitecture

This 18-storey rack filled with greenery, housing units and shops is a result of collaboration between MVRDV, landscape architect Alice Tricon and developer OGIC, aiming to create a biodiverse haven challenging traditional apartment living.

article thumbnail

Mass Timber Logistics Hub in Netherlands by Henning Larsen

aasarchitecture

Biogenic materials and significantly increasing biodiversity are prioritized – over 40% of the site is dedicated to its landscape, inspired by the surrounding island habitat. The structure will be built primarily of mass timber and other biogenic materials such as straw. The site is set to be completed in 2026.

Diagram 69