Remove 2026 Remove Engineering Remove Estimating Remove Structure
article thumbnail

Sagrada Familia announces 2026 final completion date

Deezen

La Sagrada Familia Foundation has announced that the monumental church in Barcelona is set for completion in 2026, 100 years after the death of its architect Antoni Gaudí. The Chapel of the Assumption is expected to be finished in 2025 and the tower of Jesus Christ in 2026," La Sagrada Familia Foundation told news site CNN.

article thumbnail

Populous unveils plan to revamp horse-racing track in New York

Deezen

million square foot (116,1300-square metre) structure – including 275,000 square feet (25,550 square metres) of interior space – to modernize the complex and add contemporary amenities and hospitality offerings, as well as transform the racetrack into a multi-purpose venue for both racing and non-racing events.

Events 124
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. Pedestrian pathways provide connections Sunset red granite and glazed curtain walls will comprise the office buildings in Phase 2, which is slated to open at the end of 2026. & Elec. (AOR

Utilities 117
article thumbnail

Renovation of Vaincre la Mucoviscidose Association Offices, Paris

e-architect

Through its new associative and strategic ViVa 2026 project, “Vaincre la Mucoviscidose”, a French association fighting against cystic fibrosis, has set the goal of strengthening bonds to build a stronger community.

article thumbnail

Aviva Studios in Manchester to Open on 18th October 2023

e-architect

A 33-metre-long bar is split in two by the ‘mega pig’ which is a key part of the building’s structural engineering, holding up the proscenium arch above. A key design feature is a two-storey structure, which stands in the middle of the ground floor foyer, designed to be used for a range of usages from a welcome desk to a DJ booth.

Art 79