Remove 2026 Remove Engineering Remove Estimating Remove Structural Engineering
article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. Pedestrian pathways provide connections Sunset red granite and glazed curtain walls will comprise the office buildings in Phase 2, which is slated to open at the end of 2026. & Elec. (AOR

article thumbnail

Renovation of Vaincre la Mucoviscidose Association Offices, Paris

e-architect

Through its new associative and strategic ViVa 2026 project, “Vaincre la Mucoviscidose”, a French association fighting against cystic fibrosis, has set the goal of strengthening bonds to build a stronger community.

article thumbnail

Aviva Studios in Manchester to Open on 18th October 2023

e-architect

A 33-metre-long bar is split in two by the ‘mega pig’ which is a key part of the building’s structural engineering, holding up the proscenium arch above. When SIM is open people can seamlessly move between the spaces. Additional multi-use foyers are on Level 2 and Level 3 of the building. Website: www.artscouncil.org.uk

Art 79