Remove 2026 Remove Engineering Remove Environment Remove Site
article thumbnail

Henning Larsen unveils design for world's largest timber logistics centre

Deezen

Trees will provide shaded seating on the roof Expected to be completed by 2026, the Logistics Center West will be built largely from glued laminated timber (glulam) and cross-laminated timber (CLT) along with other biogenic materials. Rainwater from the rooftop will be collected and stored for sustainable reuse around the building.

Roofing 130
article thumbnail

Mass Timber Logistics Hub in Netherlands by Henning Larsen

aasarchitecture

Driven by a shared commitment to reduce emissions, create a fair working environment and be circular by design to minimize waste and keep resources in use. Biogenic materials and significantly increasing biodiversity are prioritized – over 40% of the site is dedicated to its landscape, inspired by the surrounding island habitat.

Diagram 69
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Opticum Research Building by HENN

aasarchitecture

The Opticum is an interdisciplinary research building for Leibniz University of Hanover currently under construction on the Science Park site located in the urban district of Marienwerder. Image © HENN Research involving laser beams and highprecision equipment requires a robust and safe environment.

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

It improves the built environment of the city and offers useful amenities that allow the public and state agencies to interact in a shared area located in the heart of Austin." Project credits: Planning/Urban Design: Page (TCCMP) Architect: Master Architect/Engineer: Page, AOR for George HW Bush Building: HKS, Inc., & Elec. (AOR

Utilities 112
article thumbnail

LA VIE in Muscat by 10 Design

aasarchitecture

Image © 10 Design For the golf-driven hospitality environments of today and tomorrow, designers are tasked with creating vibrant backdrops for social events and gatherings that will resonate with multifaceted, multigenerational audiences. The full structure is slated for completion at the end of 2024, with an anticipated opening of Q1 2026.

article thumbnail

Enterprise Research Campus by Henning Larsen and Studio Gang break ground

aasarchitecture

Adjacent to Harvard’s Science and Engineering Complex and Business School, the development will transform an underutilized industrial site into an active mixed-use urban hub, home to laboratories, offices, and residential, hotel and conference spaces, designed to deepen partnerships between industry and research.

article thumbnail

Minerva House extension by Ben Adams Architects

aasarchitecture

The ground floor will feature a dynamic mix of retail, food options, and co-working spaces, while the middle floors will cater to more traditional office environments. The project will start on site in 2023 with completion expected in 2026. Source by Ben Adams Architects.