Remove 2026 Remove Contractor Remove Landscape Remove Structural Engineering
article thumbnail

Tree planting ceremony marks start of construction on MVRDV’s La Serre

aasarchitecture

This 18-storey rack filled with greenery, housing units and shops is a result of collaboration between MVRDV, landscape architect Alice Tricon and developer OGIC, aiming to create a biodiverse haven challenging traditional apartment living.

article thumbnail

Fulldraw Vineyard by Clayton Korte

aasarchitecture

Photo © Likeness Studio The 12,620-square-foot winery complex consists of three buildings: a 6,972-square-foot Fermentation Building and Barrel Aging and a 2,170-square-foot Case Good Storage area, plus a second phase hospitality building that should be complete by 2026.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

Pedestrian pathways provide connections and embedded plazas to landmarks like the Texas History Museum and the University of Texas at Austin Blanton Art Museum , stitching together an easily navigable urban fabric for visitors and "fostering unity between Austin's past and present and enriching the city's cultural landscape." & Elec.

Utilities 105
article thumbnail

Issy La Serre by MVRDV

aasarchitecture

This 18-storey rack filled with greenery, housing units and shops is a result of collaboration between MVRDV, landscape architect Alice Tricon and developer OGIC, aiming to create a biodiverse haven challenging traditional apartment living.

article thumbnail

Minerva House extension by Ben Adams Architects

aasarchitecture

The project will start on site in 2023 with completion expected in 2026. Source by Ben Adams Architects.