Remove 2026 Remove Construction Remove Estimating Remove Structural Engineering
article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. The project was created to "cultivate a stronger sense of community" Currently under construction, Phase 2 utilizes Page's master plans with final architectural designs by HOK. & Elec.

article thumbnail

Renovation of Vaincre la Mucoviscidose Association Offices, Paris

e-architect

Through its new associative and strategic ViVa 2026 project, “Vaincre la Mucoviscidose”, a French association fighting against cystic fibrosis, has set the goal of strengthening bonds to build a stronger community. In 2020, he founded WGA – the William Gonord Architecte agency.

article thumbnail

Aviva Studios in Manchester to Open on 18th October 2023

e-architect

July 2021: Deborah Warner’s installation Arcadia takes place within the construction site of the building as part of Manchester International Festival. A 33-metre-long bar is split in two by the ‘mega pig’ which is a key part of the building’s structural engineering, holding up the proscenium arch above.

Art 79