Remove 2026 Remove Construction Remove Engineering Remove Estimating
article thumbnail

Sagrada Familia announces 2026 final completion date

Deezen

La Sagrada Familia Foundation has announced that the monumental church in Barcelona is set for completion in 2026, 100 years after the death of its architect Antoni Gaudí. Construction on the Sagrada Familia began in 1882 and was led by Gaudí until his passing in 1926. The current design is based on reconstructed plans and models.

article thumbnail

Populous unveils plan to revamp horse-racing track in New York

Deezen

The white building will be shaded by a cantilevered roof The redevelopment project also extends to the barn and backstretch areas, with the construction of three new dormitories and bicycle-storage sheds to encourage multi-modal travel. Renovated spaces will include an on-site medical facility, recreation hall, track kitchen and gymnasium.

Events 125
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. The project was created to "cultivate a stronger sense of community" Currently under construction, Phase 2 utilizes Page's master plans with final architectural designs by HOK. & Elec.

Utilities 120
article thumbnail

Renovation of Vaincre la Mucoviscidose Association Offices, Paris

e-architect

Through its new associative and strategic ViVa 2026 project, “Vaincre la Mucoviscidose”, a French association fighting against cystic fibrosis, has set the goal of strengthening bonds to build a stronger community. In 2020, he founded WGA – the William Gonord Architecte agency.

article thumbnail

Aviva Studios in Manchester to Open on 18th October 2023

e-architect

July 2021: Deborah Warner’s installation Arcadia takes place within the construction site of the building as part of Manchester International Festival. A 33-metre-long bar is split in two by the ‘mega pig’ which is a key part of the building’s structural engineering, holding up the proscenium arch above. Website: www.artscouncil.org.uk

Art 79