Remove 2026 Remove Clients Remove Environment Remove Structure
article thumbnail

Arch Mist wins competition to design Jamsu Bridge in Seoularch mins

aasarchitecture

The landscape design not only enriches the overall natural environment but also creates space for everyone visiting. From a structural perspective, the design uses minimal and rational structural intervention to maximize the improvement of the space. The construction begins next year and is expected to be completed by 2026.

Design 52
article thumbnail

Henning Larsen unveils design for world's largest timber logistics centre

Deezen

Trees will provide shaded seating on the roof Expected to be completed by 2026, the Logistics Center West will be built largely from glued laminated timber (glulam) and cross-laminated timber (CLT) along with other biogenic materials. Rainwater from the rooftop will be collected and stored for sustainable reuse around the building.

Roofing 129
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

New Station Building in Gothenburg by Reiulf Ramstad Arkitekter

aasarchitecture

In European metropolitan tradition, the train station was often a monumental architectural structure. An attractive junction point is created here to get more people to travel by public transport in a safe and sustainable urban environment. A cathedral of modernism which today manages great cultural and historical values.

article thumbnail

Aedas-designed Trojena Ski Village: a futuristic ski destination in NEOM

aasarchitecture

Scheduled for completion in 2026, the resort will include year-round skiing (3 months on snow and year-round synthetic “dry” skiing), retail stores, restaurants, luxury mansions, apartments and luxury hotels including serviced apartments operated by prestigious operators. Source by Aedas.

Design 64
article thumbnail

Mass Timber Logistics Hub in Netherlands by Henning Larsen

aasarchitecture

Driven by a shared commitment to reduce emissions, create a fair working environment and be circular by design to minimize waste and keep resources in use. The structure will be built primarily of mass timber and other biogenic materials such as straw. The site is set to be completed in 2026. Source by Henning Larsen.

Diagram 69
article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

It includes two new high-rise office buildings that measure over one million square feet (92,903 square metres), a central utility plant for efficient cooling and a five-storey, below-grade structure with over 3,000 square feet (280 square metres) of parking space. & Elec.

Utilities 118
article thumbnail

Opticum Research Building by HENN

aasarchitecture

Image © HENN Research involving laser beams and highprecision equipment requires a robust and safe environment. Its surface uses warm, iridescent hues to blend into its natural environment. Second Floor Plan Its clean structure is complemented by staggered vertical solar control louvers that create a playful rhythm.