Remove 2026 Remove Civil Engineering Remove Landscape Remove Structural Engineering
article thumbnail

Fulldraw Vineyard by Clayton Korte

aasarchitecture

Photo © Likeness Studio The 12,620-square-foot winery complex consists of three buildings: a 6,972-square-foot Fermentation Building and Barrel Aging and a 2,170-square-foot Case Good Storage area, plus a second phase hospitality building that should be complete by 2026.

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

Pedestrian pathways provide connections and embedded plazas to landmarks like the Texas History Museum and the University of Texas at Austin Blanton Art Museum , stitching together an easily navigable urban fabric for visitors and "fostering unity between Austin's past and present and enriching the city's cultural landscape." & Elec. (AOR

Utilities 105
article thumbnail

Aviva Studios in Manchester to Open on 18th October 2023

e-architect

A 33-metre-long bar is split in two by the ‘mega pig’ which is a key part of the building’s structural engineering, holding up the proscenium arch above. When SIM is open people can seamlessly move between the spaces. Additional multi-use foyers are on Level 2 and Level 3 of the building.

Art 79