Remove 2026 Remove Civil Engineering Remove Engineering Remove Environment
article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

It improves the built environment of the city and offers useful amenities that allow the public and state agencies to interact in a shared area located in the heart of Austin." Project credits: Planning/Urban Design: Page (TCCMP) Architect: Master Architect/Engineer: Page, AOR for George HW Bush Building: HKS, Inc., & Elec. (AOR

Utilities 105
article thumbnail

Fulldraw Vineyard by Clayton Korte

aasarchitecture

Photo © Likeness Studio The 12,620-square-foot winery complex consists of three buildings: a 6,972-square-foot Fermentation Building and Barrel Aging and a 2,170-square-foot Case Good Storage area, plus a second phase hospitality building that should be complete by 2026.

article thumbnail

Aviva Studios in Manchester to Open on 18th October 2023

e-architect

It is a space that can create multiple opportunities and endless configurations and environments. A 33-metre-long bar is split in two by the ‘mega pig’ which is a key part of the building’s structural engineering, holding up the proscenium arch above. Additional multi-use foyers are on Level 2 and Level 3 of the building.

Art 79