Remove 2025 Remove Diagram Remove Landscape Remove Sustainability
article thumbnail

Cloud 9 Sports Center by MAD Architects

aasarchitecture

Image © MAD Architects The center’s design integrated several features early in the process to enhance both its functionality and environmental sustainability. Cloud 9 Sports Center broke ground in March 2024 and is expected to be completed in 2025. Source by MAD Architects.

article thumbnail

Västerås Travel Center by BIG – Bjarke Ingels Group

aasarchitecture

The building is expected to open in 2025 and seeks to bring the entire city’s infrastructure together under one roof. BIG’s design has evolved over the years to ensure the best possible solutions in function, program, sustainability, and future security.

Diagram 102
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Schmidt Hammer Lassen wins competition for transformation and expansion of Helsingborg Library

aasarchitecture

A symbiosis of old and new, past, present, and future Respect for the existing structure, the park landscape, and the position that Helsingborg City Library already holds in the city has been the driving force behind SHL’s winning proposal. The expected start of construction is late 2025. Source by Schmidt Hammer Lassen.

Diagram 59
article thumbnail

DESMAN Headquarters in Hangzhou by Aedas

aasarchitecture

The headquarters connects the major public green axis, overlooking the Smart Gate to the north and the landscape park to the south. Image © Aedas Stitches with the surrounding landscape, the concept is set to create a hybrid of smart architecture and ecological landmark. Source by Aedas.

Diagram 52
article thumbnail

MAD completes the “Train Station in the Forest”

aasarchitecture

It is expected that by 2025, the full passenger capacity will reach 5.28 Photo © AC MAD’s design prioritizes the emotional and spiritual needs of citizens, brings in natural landscapes, and integrates urban spaces and building volumes into nature.

article thumbnail

Innovation Partnership School Buildings by OMA

aasarchitecture

Amsterdam will halve the use of primary raw materials by 2030 and become fully circular by 2050 – according to the Circular Strategy 2020-2025 proposed by the municipality. At the end of the schools’ lifecycles, the buildings can be fully dismantled, and the components can be reused to create other types of buildings such as offices or homes.

article thumbnail

Ecopolis by TSPA

aasarchitecture

The 600-mile-long island plans to be Russia’s first carbon neutral region by 2025. To develop the city, TSPA partnered with Wowhaus (RU), Nomura Research Institute (JP), and the Scientific Research Institute of Ecology and Sustainable Management of Natural Resources (RU). Circularity diagram. Master Plan.

Diagram 52