Remove 2025 Remove Construction Remove Site Remove Structural Engineering
article thumbnail

New childcare center at Munich’s Technical University by Kéré Architecture

aasarchitecture

The ground-breaking ceremony took place on April 18 on the building site at Gabelsbergerstrasse 41, directly between the TUM main campus and the university canteen. From the end of 2025, there will be space for 60 children with 700 square meters at their disposal. Source by Kéré Architecture. KG, Munich Energy efficiency: TUM Prof.

article thumbnail

MAD unveils sunken Train Station in the Forest in Jiaxing

Deezen

million people a year by 2025, was increased from five tracks to six tracks. A total of 1,500 trees were planted across the site, with beech trees lining the central axis of the north square that are intended to create a canopy when fully grown, which the name of the project Train Station in the Forest came from.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Carmody Groarke to add children's pavilion to Dulwich Picture Gallery

Deezen

A square pavilion will be added to the gallery grounds It will be angled 45 degrees to the gallery, intending to relate to the two entrances to the site, while circular windows will give views across the landscape. Construction on the gallery's redevelopment is set to commence at the end of 2023 and is due to be completed in early 2025.

article thumbnail

Henning Larsen wins NEOMA’s new Reims campus competition

aasarchitecture

Overlooking the channel in Reims, Henning Larsen’s design for NEOMA Business School’s new campus of 26,000 m2 aims to accommodate 4700 students and is scheduled to open for the start of the 2025 academic year. Located west of the center of Reims, the site chosen for the new NEOMA school is part of a neighborhood in transfer: Port Colbert.

article thumbnail

Blakely Island Retreat // Wittman Estes

Architizer

The careful arrangement of the program considers the delicate rocky ecology of the steep shoreline and the difficulty of getting typical construction machinery to the site. The dining terrace and living room orient to the west to enjoy the setting evening sun.The residence’s expected completion date is 2025. © Wittman Estes.

article thumbnail

Dairy Apartments Portland, Oregon

e-architect

Currently under construction, this residential property project’s estimated completion is March 2025. The resulting design includes two 7-story housing bars on a full-block, 2-story podium arranging ground-floor residential and amenity spaces around a central private courtyard.

article thumbnail

Powerhouse Parramatta, West Sydney, NSW

e-architect

billion transformation, spearheaded by the development of Powerhouse Parramatta on a landmark site in Western Sydney. Designed by Moreau Kusunoki and Genton, Powerhouse Parramatta is the largest cultural development in Australia to be created since the Sydney Opera House and is planned to open in early 2025. No gas will be used.

Art 58