Remove 2025 Remove Construction Remove Diagram Remove Structural Engineering
article thumbnail

Innovation Partnership School Buildings by OMA

aasarchitecture

Amsterdam will halve the use of primary raw materials by 2030 and become fully circular by 2050 – according to the Circular Strategy 2020-2025 proposed by the municipality. The biobased walls – made with carbon absorbing raw materials – are lighter and require less energy for transportation.

article thumbnail

MAKERS’ KUbe by BIG and University of Kansas School of Architecture & Design

aasarchitecture

The Makers’ KUbe is a 50,000-square-foot mass timber cube structure. The KUbe’s distinct timber diagrid frame – engineered by structural engineer StructureCraft – is optimized to reduce material and curtail carbon-intensive concrete. Source by BIG – Bjarke Ingels Group.