Remove 2025 Remove Construction Remove Diagram Remove Landscape
article thumbnail

Cloud 9 Sports Center by MAD Architects

aasarchitecture

Shijiazhuang, a city with a history rooted in early 20th-century railway construction, is undergoing a significant transformation. Cloud 9 Sports Center broke ground in March 2024 and is expected to be completed in 2025. Landscape Consultant: SWA Group Curtain Wall Consultant: Yinghaite Engineering Consulting (Beijing) Co.,

article thumbnail

Anji Culture and Art Center by MAD Architects

aasarchitecture

Anji Culture and Art Center covers an area of about 149,000 square meters, with a total construction area of about 120,000 square meters. The high point of Anji Culture and Art Center is a series of overlapping metal roofs resembling scattered bamboo leaves with ridges that add visual complexity to the breathtaking landscape.

Art 59
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Schmidt Hammer Lassen wins competition for transformation and expansion of Helsingborg Library

aasarchitecture

A symbiosis of old and new, past, present, and future Respect for the existing structure, the park landscape, and the position that Helsingborg City Library already holds in the city has been the driving force behind SHL’s winning proposal. The expected start of construction is late 2025. Source by Schmidt Hammer Lassen.

Diagram 59
article thumbnail

MAD completes the “Train Station in the Forest”

aasarchitecture

The station that was constructed in 1995 to replace the original station had an area of only 4,000 square meters and was equipped with outdated passenger facilities unsuitable for a rapidly expanding city. It is expected that by 2025, the full passenger capacity will reach 5.28

article thumbnail

Innovation Partnership School Buildings by OMA

aasarchitecture

Amsterdam will halve the use of primary raw materials by 2030 and become fully circular by 2050 – according to the Circular Strategy 2020-2025 proposed by the municipality. The biobased walls – made with carbon absorbing raw materials – are lighter and require less energy for transportation.

article thumbnail

Ecopolis by TSPA

aasarchitecture

The 600-mile-long island plans to be Russia’s first carbon neutral region by 2025. Circularity diagram. These facilities supply the city with construction materials, food, and clean water, reducing imported goods’ environmental and economic externalities. Source and images Coutesy of TSPA.

Diagram 52
article thumbnail

Ecopolis by TSPA

aasarchitecture

The 600-mile-long island plans to be Russia’s first carbon neutral region by 2025. Circularity diagram. These facilities supply the city with construction materials, food, and clean water, reducing imported goods’ environmental and economic externalities. Source and images Coutesy of TSPA.

Diagram 52