Remove 2019 Remove Civil Engineering Remove Information Remove Structural Engineering
article thumbnail

University of Arizona Health Sciences Innovation Building // CO Architects

Architizer

Year: 2019. The Center for Advanced Technologies in Healthcare unites the health professions disciplines, engineering, behavioral sciences, information systems and others in multidisciplinary research and development endeavors. Project Status: Built. Size: 100,000 sqft – 300,000 sqft. Budget: 100M +. © CO Architects.

article thumbnail

Barrow House, Lincolnshire Property

e-architect

Hailed as a “worthy and standout winner” of the prize at the grand final of the 2019 LABC National Building Excellence Awards in December, it features 18-metre-long sliding doors and a projecting master bedroom pod offering impressive views over the natural landscape and Bronze-Age Barrow. Completion date: 2019.

Housing 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Century 21 theater rehabilitation, San Jose, California

e-architect

Originally part of a complex of three adjacent domes – two of which were demolished in 2019 – the structure is the last domed cinema in the Bay Area , a local landmark listed on the California Register of Historical Resources and has been determined eligible for the National Register of Historic Places. Civil Engineer: BKF Engineers.

article thumbnail

Little Rock Art Museum, Arkansas, USA

e-architect

The museum, which was founded in 1937, has been closed to the public since 2019 while it underwent its major expansion and renovation. The project broke ground in 2019. For more information, see AMFA’s website. Thornton Tomasetti, Structural Engineer and Enclosure Consultant. dbHMS, MEP/FP Engineer.

Art 50
article thumbnail

Dreyfuss + Blackford Rehabilitate the 1950s SMUD Headquarters Building

Architizer

Year: 2019. Also, in advance of design and construction, SMUD staged a series of community engagement discussions throughout Sacramento to inform the public and the preservation community about the intent and impact of the project. Project Status: Built. Size: 100,000 sqft – 300,000 sqft. Budget: 50M – 100M.

article thumbnail

Chao Phraya Sky Park, Bangkok

e-architect

Since vacant areas along the riverfront in central Bangkok were occupied, either by informal settlements or luxurious hotels, why not create a new public green space over the river? Chao Phraya Sk Park in Bangkok, Thailand – Building Information. Civil Engineer: Pisitsak Serklin, Sukkawich Thepchana.

Cities 52
article thumbnail

100 Best Architecture Firms in the World [2020 Update]

Architecture Quote

In 2019, Progetto CMR was the 4th largest architecture company in Italy. In 2019, Patel was a speaker at a Cambridge Centre for Housing and Planning Research event called “ Households of the Future “, held at the University of Cambridge. Kirsten Sørensen joined Link Arkitektur in 2015, and became CEO in 2019.