Remove 2018 Remove Clients Remove Contractor Remove Engineering
article thumbnail

Snøhetta creates library to emulate feeling of "sitting under a tree"

Deezen

It is a glass-lined building filled with towering columns Beijing City Library was publicly revealed in 2022 after being selected as the winner of an international competition in 2018. It has been completed by Snøhetta in collaboration with local studio ECADI.

article thumbnail

Civilian draws on "grandeur" of early cinemas for Sandbox Films offices

Deezen

Civilian was founded in 2018 by Kagner and Nicko Elliott, and the designers have since completed projects ranging from the transformation of Detroit's historic Book Depository into a headquarters for tech company Newlab , to the renovation of a historic Bed-Stuy townhouse for themselves. The photography is by Chris Mottalini.

Events 124
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

Project credits: Planning/Urban Design: Page (TCCMP) Architect: Master Architect/Engineer: Page, AOR for George HW Bush Building: HKS, Inc., & Elec. (AOR & Elec. (AOR & Elec. Master AE Team), CNG (Plumbing Master AE Team), Jose I. Guerra, Inc.

Utilities 105
article thumbnail

Dogtrot Residence // CLB Architects

Architizer

Year: 2018. Civil Engineer: Agrostis, Inc.Structural Engineer: KL&AMechanical Engineer: JM EngineeringElectrical Engineer: Helius Lighting GroupGeotechnical Engineer: Teton Geotechnical Lighting: Helius Lighting GroupPhotographyAudrey Hall (summer)Matthew Millman (winter). Project Status: Built.

article thumbnail

ZGF transforms Pittsburgh Ford Assembly plant into research facility

Deezen

The client's eagerness to embrace the raw industrial nature is significant because there are moments throughout the building where you can really witness its history.". The cars were sold out of a ground-floor retail showroom until the mid-20th century, and the structure was listed on the National Register of Historic Places in 2018.

article thumbnail

Riverbend // CLB Architects

Architizer

Year: 2018. While texture and color reflecting the personality of the client are introduced in interior furnishings, the overall restraint of the architectural palette creates a built experience that has the feel of a quiet platform set amidst the trees. Project Status: Built. Size: 5000 sqft – 10,000 sqft. © CLB Architects.

article thumbnail

Toni Catany International Photography Centre

e-architect

1st Prize (by unanimity): National Project Competition 2018. Client: Government of the Balearic Islands (Department of Culture) and Spanish Ministry of Culture. Design date: 2018-2019. Other participants: Contractor: Obras y Pavimentos MAN. Structures: BAC Engineering Consultancy Group.