Remove 2016 Remove Civil Engineering Remove Contractor Remove Site
article thumbnail

Bohlin Cywinski Jackson designs nature-infused Henry Island Guesthouse in Washington

Deezen

Photo is by Benjamin Benschneider The site is reached by boat, and a winding path leads from a dock through a wooded area and into a sunlit meadow. When new owners purchased the property in 2016, they engaged us to make additions to the site that respected the natural character of the sparsely populated island," the firm said.

Nature 135
article thumbnail

Revitalizing a Contaminated Site: The Ford Calumet Environmental Center

Architizer

Project Status: Built Year: 2021 Size: 5000 sqft – 10,000 sqft Ford Calumet Environmental Center – Once a dumping ground from nearby steel mills, Big Marsh park opened in 2016 on the southeast side of Chicago. miles from the site.

Site 73
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

for the three-phase master plan, which was outlined in 2016. Project credits: Planning/Urban Design: Page (TCCMP) Architect: Master Architect/Engineer: Page, AOR for George HW Bush Building: HKS, Inc., & Elec. (AOR & Elec.

Utilities 105
article thumbnail

Subterranean WW2 bunker holiday home Dorset

e-architect

link] Symmetrys Symmetrys is a leading structural and civil engineering consultancy committed to providing responsible and innovative solutions for its clients. That way, you get intelligently-designed places – places that invigorate communities and maximise long-term civic and commercial value.

Home 83
article thumbnail

The Team on Tops

Landscape Architecture Magazine

An unexpected amount of rain fell on the Presidio Tunnel Tops construction site this past October. The rain was a mixed blessing; though welcomed by parched San Francisco Bay Area residents, it had damaged parts of the job site. Cabot has been with the trust since 2016. Photo by Rachel Styer. Photo courtesy Lily Siu.

article thumbnail

Steven S Wymer Hall, University of Illinois Urbana-Champaign, USA

e-architect

Site Area: 73,342 SFT (6,814 s.m.). The quality of the work has been recognized with nearly 300 national and international design awards, including the prestigious 2016 National Architecture Firm Award from the American Institute of Architects (AIA). Plus 84 enclosed private offices, shared office spaces, and a 200-seat auditorium.

article thumbnail

The Buxton Center for Bainbridge Performing Arts

e-architect

Visitors are currently welcome for an inside look at the new Buxton Center as it is being built, and tours of the construction site are available by free registration. Site Area: 32,000 SFT (2,973 s.m.) New addition of Main lobby, 2nd floor balcony and auditorium entry, new administrative offices, and multipurpose studio theater.

Art 55