Remove Schematic Design Remove Sustainability Remove Transportation Remove Zoning
article thumbnail

Singapore’s new Science Centre by Zaha Hadid Architects

aasarchitecture

Through its programmes and exhibitions, the centre will also educate visitors on sustainability practices such as vertical farming systems. In line with the Singapore Green Plan 2030, the new Science Centre incorporates sustainable design principles and energy performance strategies to reduce net carbon emissions.

article thumbnail

The A+List: Architizer’s Top Architecture and Design Firms to Watch in 2024

Architizer

This multifaceted approach is evident in projects such as Kia Lab, which take a holistic view of the programmatic brief, embedding the building’s function with the broader urban and cultural environment.

Firms 93
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

New Science Centre at Jurong Lake Gardens

e-architect

Through its programmes and exhibitions, the centre will also educate visitors on sustainability practices such as vertical farming systems. In line with the Singapore Green Plan 2030, the new Science Centre incorporates sustainable design principles and energy performance strategies to reduce net carbon emissions.

article thumbnail

100 Women to Watch in Architecture

Architizer

Right: Public Farm 1, a 2008 installation on the grounds of Long Island City’s MoMA PS1 by Amale Andraos’s firm, WORKac; the museum described the installation as “a living structure made from inexpensive and sustainable materials recyclable after its use at PS1”; images via MoMA PS1 and Archinect. Amale Andraos. Tatiana Bilbao.

article thumbnail

Competitions: Design Competition of International Islands and the Future Residence

Bustler

The surrounding transportation network of the plot is very convenient. And thus, it is suggested to combine the existing plot conditions with the overall planning and design for the project. The detailed cooperation unit shall submit contents of the detailed schematic design according to the requirements as stated below: 1.