Remove IT Remove Schematic Design Remove Site Remove Structural Engineering
article thumbnail

Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Of course, each project is unique and complex sites or functional requirements can add additional costs to these elements. The hard cost of construction is typically the cost for construction of the building, materials, labor, basic site work, and the general contractor’s fee.

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

Commercial architectural design is a complex, multi-layered process that requires detailed planning, research, and collaboration. Undertaking your own commercial design project can feel a little daunting. However, specific local regulations and restrictions that impact the design process will vary from country to country.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

The National Speed Skating Oval or the Ice Ribbon by Populous

aasarchitecture

Designed as a spectacular new landmark by global sports architecture firm Populous, after winning an international design competition, the ‘Ice Ribbon’ was created as a symbol of Chinese cultural heritage that celebrates the elegance, precision, pace and dynamic of speed skating. Photo Courtesy of Populous.

article thumbnail

Singapore’s new Science Centre by Zaha Hadid Architects

aasarchitecture

Singapore’s Science Centre Board has unveiled the design of the new Science Centre which will provide unique facilities and programmes as a destination for all Singaporeans to access science, technology, engineering and mathematics (STEM) education and experiences. Image © Zaha Hadid Architects (ZHA).

article thumbnail

ACLA Redesigns Buhl Community Park and Emphasizes the Importance of Community Connection

Architizer

Buhl Community Park – After winning a national competition to redesign the plaza in front of the Pittsburgh Children’s Museum ACLA began to work on integrating our design concepts with the physical realities and cultural context of the site. How important was sustainability as a design criteria as you worked on this project? .

article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Work is organized into three principle activities: 1) Design Development and Entitlement Processes ; 2) Site Development Permits and Construction Documents for Upper Garden Development ; and 3) eighteen months of construction. The half-acre Pollinator Meadow features 240 unique taxa or different plant varieties.