Remove Diagram Remove Schematic Design Remove Site Remove Zoning
article thumbnail

Schematic Design – This isn’t “Architecture”

Life of an Architect

This phase of the work is widely referred to as “Schematic Design” Although some people also have an earlier phase called “Programming”, I tend to consider that as part of the schematic design phase as well, rather than separate it out into its own special section. It was way better.

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

555 Ocean Ave (Newport, Rhode Island) In previous Archi-TEXT articles it was discussed the value of an architect to help you navigate the various phases of the design of a new home or building or the renovation of an existing one, but what are the various phases of the architectural design process?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

The Best Architect Exam Prep Resources

The Architect's Guide

Project, Planning, & Design (PPD). Project Planning & Design (PPD) is an exam that tests your ability to design sites and buildings. It should be called “Schematic Design.” Expect to get scenario based questions on issues related to programming, site analysis, and zoning and code requirements.

article thumbnail

Competitions: Design Competition of International Islands and the Future Residence

Bustler

The site area of the plot is about 15939.9㎡. For detailed regulation conditions, please see competition documents – site planning and su file) Design Requirements. Design description: to systematically describe the scheme of architecture, interior, gardening landscape and the design of scenes.

article thumbnail

Competitions: The International Competition of Open Call for the Creative Scheme of Cuihu Sports Centre

Bustler

The project geographic position is superior, locating on the middle-west bank of the Pearl River Estuary, with Guangzhou Nansha New District in the north, Zhuhai Hengqin New District in the south, Shenzhen Qianhai New District in the east connected by Shenzhen-Zhongshan Corridor, and Zhongshan Torch Development Zone in the west.