Remove Contractor Remove Permits Remove Structural Engineering Remove Utilities
article thumbnail

It’s Your Average Off-Grid Shipping Container Home—Just Set on a Tall Metal Tower

Dwell

This structure was to be very strong, be as fire resistant as possible and require as little long term exterior maintenance as possible. This was accomplished by utilizes repurposed shipping containers, a galvanized tower crane mast and tower components, metal interior framing, aluminum framed windows/trim and stainless steel ceilings.

Permits 108
article thumbnail

Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Keep in mind that early pre-design cost per square foot ranges may be for the building only, while your project may include specialty elements that will need to be added on for things like extensive landscaping, decks, patios, pools, specialty site work like large retaining walls or bringing utilities to rural sites.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Skidmore, Owings & Merrill (SOM) Design Iconic External Diagrid for Shenzhen Rural Commercial Bank Headquarters

Architizer

The building was designed to “breathe” and flex to occupant needs, utilizing naturally ventilated atria and a column-free externalized structure. Operable windows in all office spaces and two vertical atria span the height of the tower, allowing the building to “breathe” the fresh coastal air as seasonal weather permits. .

article thumbnail

022: Residential Construction Costs

Life of an Architect

Some examples of hard costs are: Providing utilities to the site if not currently present Site Preparation (clearing away trees, stabilizing soil, cutting and filling to grade the site, etc.) Structural Engineer – very cost effective service to retain and in some cases, a mandatory consultant to retain.

article thumbnail

10 Best Criteria to know the Estimation of Your Dream House

Design Thoughts Architects

Any ambiguous language or badly drawn plan not only causes confusion but also creates doubt in the mind of the contractor, resulting in a higher construction cost. Cost varies based on the structural engineer’s advice and details. CARPET AREA + WALL AREA = BUILT UP AREA. If there are any sheer walls like a lift pit.

article thumbnail

St Christina’s Primary School, St John’s Wood, London

e-architect

The existing change in levels across the ground floor permitted generous ceiling heights in the early years wing, which are punctuated by large rooflights in the reception classrooms contributing to a spacious, light and airy learning environment.