Remove Contractor Remove Foundation Remove Schematic Design Remove Windows
article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

Woven Designs L Shape Vacation Home Vertes Retreat

Architizer

Thankfully, Jenkins Construction (the General Contractor), owner and designers resolved to continue with all aspects of the project as efficiently as possible. How did the context of your project — environmental, social or cultural — influence your design? © Woven Architecture and Design. © Woven Architecture and Design.

Home 67
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Documenting Architecture with Photos

Life of an Architect

Most of the time I coordinate these site visits with some milestone or because the contractor has a question that requires my presence on site to answer … but I go by the job site even more than required because I truly enjoy being on site and watching how things come together. Foundation begins. Window flashing … check.

article thumbnail

Letters of an Architect: Lessons from my Best Projects

Community Architect

As a step towards the schematic design refinements, my boss had prepared 6' long pencil-drawn and marker-colored large-scale wall sections on narrow sketch paper strips that showed how everything should fit together. They gave free up-front advice long before the design was ready for bid.

Project 80