Remove Contractor Remove Foundation Remove Permits Remove Schematic Design
article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

Let’s explore the essential elements of successful commercial design in 6 simple steps, so you can better understand what to expect and how to make the most of the experience. Architects are key figures in any design project. All the logistics must be figured out before they can move on to design concepts and proposals.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

Even overhead charges, and the contractor’s profit margin. So that general contractors use it when bidding on building projects. Also includes quality control, protection, utilities, administration, legal fees, and permits. Level 2 – Advanced or Schematic: The estimate incorporates the developed schematic design.

article thumbnail

Better Project Management for Small Firm Architects

EntreArchitect

Our complete Pre-Design Client Questionnaire template is included with your purchase of our Foundations: Business Forms and Checklists for Architects package. When we listen carefully throughout the project, our clients and contractors will guide us to success. We then prepare Schematic Designs based on those expectations.

article thumbnail

Architecture Market Analysis Report

Architecture Quote

From this we can deduce that: Residential construction permits, starts, and under construction, all fell in 2018 Residential construction permits fell by 14.6% Due to this project, the process for applying for a permit can take only a few hours. 600 building permits – the fourth-highest result since 2010.