Remove Contractor Remove Estimating Remove Safety Remove Structural Engineering
article thumbnail

Meet the Team: Who Works with an Architect on a Design Project?

DesignScape Architects

From building contractors, civil engineers, and even interior designers — we’re here to help you find out exactly who works with an architect. The primary role of any quantity surveyor is to manage a construction project’s costs and ensure the project is completed within the estimated budget.

Project 52
article thumbnail

Morphosis completes terracotta-clad Orange County Museum of Art

Deezen

General contractor: Clark Construction Group. Structural engineer: John A. MEP engineer & sustainability: Buro Happold. Civil engineer: KPFF. Fire life safety engineers: Simpons Gumpertz & Heger. Cost estimator: Dharam Consulting. Architect: Morphosis. Martin & Associates.

Art 120
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

Commercial architects need to cater to the public and understand how large groups use communal spaces while maximising functionality, comfort, and safety for everyone who enters the building. Health and safety requirements will also be included in the design of buildings for healthcare institutions.

article thumbnail

Career as an Architect-Building the Future!

The Arch Insider

In addition to designing, architects are also responsible for coordinating all the building services; including electrical, plumbing, fire safety, etc., Clients, contractors, authorities, and project managers would always be after you for drawings, details, documents, and whatnot! within the buildings.

article thumbnail

Career as an Architect-Building the Future!

The Arch Insider

In addition to designing, architects are also responsible for coordinating all the building services; including electrical, plumbing, fire safety, etc., Clients, contractors, authorities, and project managers would always be after you for drawings, details, documents, and whatnot! within the buildings.

article thumbnail

The high cost of low maintenance

BD+C

This article will identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance. The longer maintenance is deferred, the more the structure deteriorates.

article thumbnail

Renovation of Vaincre la Mucoviscidose Association Offices, Paris

e-architect

Renovation of Vaincre la Mucoviscidose Association Offices, Paris – Building Information Technical Specifications Official Project Name: Rehabilitation of Vaincre la Mucoviscidose’s Offices Location: 181 rue de Tolbiac, Paris 13th Arrondissement, France Floor Area: 1,144m² renovated / 617m² existing preserved Construction Period: July 2022 (..)