Remove Contractor Remove Engineering Remove Foundation Remove Schematic Design
article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

Let’s explore the essential elements of successful commercial design in 6 simple steps, so you can better understand what to expect and how to make the most of the experience. Architects are key figures in any design project. All the logistics must be figured out before they can move on to design concepts and proposals.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

ACLA Redesigns Buhl Community Park and Emphasizes the Importance of Community Connection

Architizer

All of these contextual elements played an important role in our design process. As I mentioned earlier the natural environment of Pittsburgh’s rivers were an important foundational concept for the design. The essence of the design remained essentially enact through construction. Consultants. Products / Materials.

article thumbnail

Woven Designs L Shape Vacation Home Vertes Retreat

Architizer

Thankfully, Jenkins Construction (the General Contractor), owner and designers resolved to continue with all aspects of the project as efficiently as possible. How did the context of your project — environmental, social or cultural — influence your design? © Woven Architecture and Design. Phillip Van Horn Design.

Home 69
article thumbnail

Back to the Garden

Landscape Architecture Magazine

From 2000 to 2005, OLIN worked on the Bethel Woods master plan, with its winding path system, and produced design and construction documents for the project. In 1997, Gerry’s foundation bought 37 acres of what had been the Yasgur farm and purchased or leased adjacent parcels. Our paving contractor said, what if?”

article thumbnail

Documenting Architecture with Photos

Life of an Architect

Most of the time I coordinate these site visits with some milestone or because the contractor has a question that requires my presence on site to answer … but I go by the job site even more than required because I truly enjoy being on site and watching how things come together. Foundation begins.

article thumbnail

Letters of an Architect: Lessons from my Best Projects

Community Architect

As a step towards the schematic design refinements, my boss had prepared 6' long pencil-drawn and marker-colored large-scale wall sections on narrow sketch paper strips that showed how everything should fit together. There were no " ed-specs " as is common in today's school design.

Project 80