Remove Contract Remove Schematic Design Remove Sketching Remove Structural Engineering
article thumbnail

Successful Project Planning for Small Firm Architects (Transcript)

EntreArchitect

Phase one of the of that project might be, let’s say schematic design and we’re going to say it’s gonna take three months and it’s going to be worth 30 percent. I think generally as architects, we’re all visual professionals, use visuals, sketch. So 30, $30,000. Robert Yuen: .

article thumbnail

Documenting Architecture with Photos

Life of an Architect

I originally introduced this project to everyone in a post I wrote called “ Sketching during Schematic Design ” that I wrote back in November 2014. That post showed the process of going from initial concept to a finished schematic design plan that I would ultimately show the clients.