Remove Contract Remove Foundation Remove Schematic Design Remove Structure
article thumbnail

Who Needs To Know?

Landscape Architecture Magazine

Firms are sharing project contracts and budgets more openly across teams as a matter of staff engagement. PAUL KISSINGER, FASLA: They have to know the contract. This is not in our contract. Well, you never showed me the contract. And also, where we are in the range of services—schematic design, design development.

article thumbnail

100 Women to Watch in Architecture

Architizer

Right: Public Farm 1, a 2008 installation on the grounds of Long Island City’s MoMA PS1 by Amale Andraos’s firm, WORKac; the museum described the installation as “a living structure made from inexpensive and sustainable materials recyclable after its use at PS1”; images via MoMA PS1 and Archinect. Amale Andraos.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Better Project Management for Small Firm Architects

EntreArchitect

Systems are the sound structure of a successful architectural firm. When a process is fully developed into a system with supporting documents of forms and checklists, it allows us to focus more on the details and development of a successful design. When we receive a contract for a new project, we all want to jump right into designing.

article thumbnail

Documenting Architecture with Photos

Life of an Architect

I originally introduced this project to everyone in a post I wrote called “ Sketching during Schematic Design ” that I wrote back in November 2014. That post showed the process of going from initial concept to a finished schematic design plan that I would ultimately show the clients. Foundation begins.

article thumbnail

Letters of an Architect: Lessons from my Best Projects

Community Architect

As a step towards the schematic design refinements, my boss had prepared 6' long pencil-drawn and marker-colored large-scale wall sections on narrow sketch paper strips that showed how everything should fit together. There were no design directors, project managers, drafters, accountants or spec writers.

Project 80