Remove Contract Remove Estimating Remove Foundation Remove Schematic Design
article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: The tender content is the schematic design and the foundation pit design of CGN New Research Center covering a site area of 71752.4?,

article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: The tender content is the schematic design and the foundation pit design of CGN New Research Center covering a site area of 71752.4?,

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Better Project Management for Small Firm Architects

EntreArchitect

When a process is fully developed into a system with supporting documents of forms and checklists, it allows us to focus more on the details and development of a successful design. When we receive a contract for a new project, we all want to jump right into designing. Estimate often. Listen carefully. Tweet This! ).

article thumbnail

100 Women to Watch in Architecture

Architizer

Tellingly, the idea to cofound the studio came while Bordas and her partner were working together at the Louis Vuitton Foundation, an experience where the paradoxical proximity and distance between the world of design and engineering was attenuated. Left: Tiffany Brown via Madame Architect ; Tiffany Brown with mentees from 400 Forward.