Remove Contract Remove Download Remove Finances Remove Information
article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

The project funding is self-financed by the enterprise itself. The foundation pit construction document design is allowed to be sub-contracted. The final schedule is subject to the contract. 1) The winner will be awarded a design contract; (2) The 2 unsuccessful finalists will be paid RMB 1.2 million (tax inclusive). (1)

article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

The project funding is self-financed by the enterprise itself. The foundation pit construction document design is allowed to be sub-contracted. The final schedule is subject to the contract. 1) The winner will be awarded a design contract; (2) The 2 unsuccessful finalists will be paid RMB 1.2 million (tax inclusive). (1)

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

140+ Software Tools for Architecture Firms [2020 Update]

Architecture Quote

Download the Complete list FREE – Link in the bottom! Outplanr is a tool used to keep projects on track , and it gives detailed information on the time spent on it against the own estimates. Free trial (15 days) per sign up is available and the starter subscription is 7.95$ per month per single user on a 3-year contract.

article thumbnail

Building Science, Climate Change and The Pretty Good House (Transcript)

EntreArchitect

Listen to this podcast episode or download the audio file here. Learn how by downloading our free course profit for small firm architects today at EntreArchitect.com/freecourse. ARCAT, the online resource delivering quality building material information, CAD details, BIM specifications and much more at ARCAT.com.