Remove Consulting Remove Schematic Design Remove Structural Engineering Remove Structure
article thumbnail

Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Additionally, interior specialties such as audio systems, wine rooms, solar systems, or home theaters, for example, should be identified and included in the schematic design budget. Extensive decks, patios, pools, and outdoor living spaces should be considered in a holistic budget during the schematic design phase.

article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Romney Hall Renovation at Montana State University by Cushing Terrell

aasarchitecture

The resulting design solution was developed based on physical assessments of the architectural, electrical, mechanical, and structural systems, which dovetailed with conceptual plans dedicated to student and faculty success.

article thumbnail

Singapore’s new Science Centre by Zaha Hadid Architects

aasarchitecture

Location: Jurong Lake District, Singapore Architect: Zaha Hadid Architects (ZHA) Design: Patrik Schumacher ZHA Project Directors: Michele Pasca Di Magliano, Maurizio Meossi ZHA Project Associate: Cristina Capanna ZHA Project Team (Design Development Stage): Benedetta Cavaliere, Damir Alispahic, Didem Sahin, Flavia Santos, Gabriele De Giovanni, Gizem (..)

article thumbnail

ACLA Redesigns Buhl Community Park and Emphasizes the Importance of Community Connection

Architizer

Our initial competition entry showed circulation pathways were a much more literal interpretation of the river concept with flowing curved edges and pier like structures extending over them. The essence of the design remained essentially enact through construction. Consultants. © Andrea Cochran Landscape Architecture.

article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Work is organized into three principle activities: 1) Design Development and Entitlement Processes ; 2) Site Development Permits and Construction Documents for Upper Garden Development ; and 3) eighteen months of construction. The Fireside Terrace is an open structure with a solid roof with views out to the tree walk.

article thumbnail

Eleftheria Square, Nicosia Cyprus

e-architect

As the largest civic plaza in Nicosia, Eleftheira Square has been designed to host festivals and public events; its upper level bridge and supporting columns are crafted in concrete, their sculptural forms ensure structural integrity in this seismic region and the base of each column morphs into seating. Consultants.