Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Additionally, interior specialties such as audio systems, wine rooms, solar systems, or home theaters, for example, should be identified and included in the schematic design budget. Extensive decks, patios, pools, and outdoor living spaces should be considered in a holistic budget during the schematic design phase.

article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Romney Hall Renovation at Montana State University by Cushing Terrell

aasarchitecture

Photo © Karl Neumann Location: Bozeman, Montana, USA Architect: Cushing Terrell Principal in Charge: Jim Beal Project Manager: Bob Franzen, Melinda Talarico, Kevin Nelson Project Architect: Kevin Nelson Architectural Design/Production: Trae Schwenneker, Diego Zapata Historic Architect: Lesley Gilmore, Chelsea Holling LEED: Ashleigh Powell Programming (..)

article thumbnail

ACLA Redesigns Buhl Community Park and Emphasizes the Importance of Community Connection

Architizer

Our initial competition entry showed circulation pathways were a much more literal interpretation of the river concept with flowing curved edges and pier like structures extending over them. The essence of the design remained essentially enact through construction. Consultants. © Andrea Cochran Landscape Architecture.

article thumbnail

Successful Project Planning for Small Firm Architects (Transcript)

EntreArchitect

Phase one of the of that project might be, let’s say schematic design and we’re going to say it’s gonna take three months and it’s going to be worth 30 percent. The same goes for tracking time, managing expenses, collaborating with contractors and viewing financial reports. So 30, $30,000.