article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Work is organized into three principle activities: 1) Design Development and Entitlement Processes ; 2) Site Development Permits and Construction Documents for Upper Garden Development ; and 3) eighteen months of construction. The first phase is approximately seven acres.

article thumbnail

13 trends, technologies, and strategies to expect in 2023

BD+C

Geospatial data analysis Geographic information systems (GIS), subsurface utility engineering (S.U.E.), and reality capture technology will continue to improve the ability of civil engineers and surveyors to map, visualize, and analyze geospatial data, whether it’s outdoors or inside.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Berliner Architects Design Unique Learning Environment for All Grades at Magnolia Science Academy

Architizer

The outdoor Promenade has numerous seating areas and informal gathering spaces that are used for a variety of formal and informal activities. Interior glazing creates an open learning environment and alcoves provide areas for display and informal collaboration. acre site was our greatest challenge. Consultants.

article thumbnail

The Role of Architects in Construction Projects

Santa Cruz Architect

Architects are appointed by the client, and they have the duty of gathering all the information and ideas necessary to create a functional space that meets client needs while being code compliant. Main Differences Between an Architect and an Engineer. Roles of Architects in Construction.

article thumbnail

Behind The Design 003: Canal House by The Ranch Mine

EntreArchitect

MPE Engineer, Structural Engineer, and Civil Engineer. Not just as a way to get people to the property, but also to allow our followers an opportunity to see our work in person and meet with us in an informal, party setting. What was the process for permitting? Phoenix, AZ. The Ranch Mine. Architect’s Name.

Mining 52
article thumbnail

Architecture Market Analysis Report

Architecture Quote

From this we can deduce that: Residential construction permits, starts, and under construction, all fell in 2018 Residential construction permits fell by 14.6% Due to this project, the process for applying for a permit can take only a few hours. 600 building permits – the fourth-highest result since 2010.

article thumbnail

Kongjian Yu: Found In Translation

Landscape Architecture Magazine

The translation of Yu’s celebrated Big Foot design principles to the site’s diminutive footprint demanded some concessions, namely in the type of plants permitted by Seattle Parks and Recreation to meet security and maintenance requirements. “In Civil Engineering MIG | SvR, Seattle. Image by Turenscape.

Safety 85