article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Work is organized into three principle activities: 1) Design Development and Entitlement Processes ; 2) Site Development Permits and Construction Documents for Upper Garden Development ; and 3) eighteen months of construction. The first phase is approximately seven acres.

article thumbnail

Meet the Team: Who Works with an Architect on a Design Project?

DesignScape Architects

From building contractors, civil engineers, and even interior designers — we’re here to help you find out exactly who works with an architect. When it comes to the specifics of who works with an architect, it’s often a challenge to know who is who. This can lead to confusion and not feeling in control of your own project.

Project 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Wittman Estes creates "rapid assembly" fire station in southern California

Deezen

By designing for offsite fabrication and rapid assembly, Wittman Estes streamlined the design, documentation and permitting process so construction could begin less than a year after the design process began," the firm said. Moreover, the team wanted to ensure the station could be built quickly. "By

article thumbnail

Explorers at Home

Landscape Architecture Magazine

On the beautiful Oregon spring day of my interview, Richard Hartlage’s practice partner at Land Morphology, Lindsey Heller, ASLA, met me with Sandy Fischer, FASLA, a quasi-staff adviser to the firm, and Christine Nack, the firm’s business manager, who was carrying a large camera to document progress. Architect Olson Kundig, Seattle.

Home 88
article thumbnail

The Role of Architects in Construction Projects

Santa Cruz Architect

Architectural services can be obtained from unlicensed persons, but they cannot call themselves architects and generally, with the exception of single-family residences, they cannot sign construction documents. Architects work hand-in-hand with other professionals such as civil and structural engineers to deliver qualified designs.

article thumbnail

Time to Abandon the Scorched Earth Approach in Subdivision Development

Community Architect

Steep streets characterize many cities: San Francisco (Photo Philipsen) In the approval steps towards site development plans, civil engineering precedes the other design professions. Civil engineers are driven by the hard rules of engineering, not the softer concerns of context sensitive design or carbon emission reduction.

article thumbnail

Architecture Market Analysis Report

Architecture Quote

From this we can deduce that: Residential construction permits, starts, and under construction, all fell in 2018 Residential construction permits fell by 14.6% Due to this project, the process for applying for a permit can take only a few hours. 600 building permits – the fourth-highest result since 2010.