Remove Civil Engineering Remove Contract Remove Contractor Remove Engineering
article thumbnail

Gehry Partners references icebergs and Hollywood for Warner Bros building

Deezen

Warner Bros contracted international architecture studio NBBJ for the interior fit-outs. Structural consultant: Englekirk Civil engineer: Psomas Elevator consultant: HKA Elevator Consulting, Inc. These are complete with paths that meander through groves of mature trees and shrubs.

Building 135
article thumbnail

Morphosis completes terracotta-clad Orange County Museum of Art

Deezen

General contractor: Clark Construction Group. Structural engineer: John A. MEP engineer & sustainability: Buro Happold. Civil engineer: KPFF. Fire life safety engineers: Simpons Gumpertz & Heger. Acoustics engineer: Newson Brown Acoustics. Geotechnical engineer: Leighton Consulting.

Art 119
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Event: Chicago Build 2022

Bustler

Attended by 1000's of visitors from contractors, architects, civil engineers, developers, government, realtors, construction prof's and more! Chicago Build 2022 features 2 unmissable days of content (300+ Speakers and Workshops); an Expo; Networking; Women in Construction; Meet the Buyer and a Festival of Construction.

Events 40
article thumbnail

Meet the Team: Who Works with an Architect on a Design Project?

DesignScape Architects

From building contractors, civil engineers, and even interior designers — we’re here to help you find out exactly who works with an architect. With in-depth building codes knowledge and detailed calculations, your team of engineers can determine if your building is strong enough to uphold all relevant standards.

Project 52
article thumbnail

Behavioral Health Teaching Facility by SRG

aasarchitecture

Location: Seattle, Washington, USA Architect: SRG Design Principal: Carl Hampson, Laurie Canup Project Director: Pierce McVey Senior Project Manager: Aimee Duquette Senior Medical Planner: Lori Epler Hout Technical Design Manager: Jessica Paley Design Team: Phil Lopez, Jon Mehlschau, Anais Adamska, Michael Talbot, Kristopher Chan, Michael Canales, (..)

article thumbnail

Dreyfuss + Blackford Rehabilitate the 1950s SMUD Headquarters Building

Architizer

Contractor Roebbelen Contracting, Inc. 12150 Tributary Point Drive, Suite 140, Gold River, CA 95670 Ben Woodside, PLA, ASLA; (916) 985-4366; bwoodside@cavalleyoffice.com Structural Engineer Buehler Engineering, Inc. Contractor Roebbelen Contracting, Inc. Contractor Roebbelen Contracting, Inc.

article thumbnail

ikon.5 architects Design Museum and Visit Center National Purple Heart Hall of Honor

Architizer

The entire design team of supporting designers and engineers collaborated in producing this highly successful project. The facility is constructed with a high-performance weathered steel rain screen panel wall system and a west facing weathered steel solar screen that most effectively reduces heat gain on the facility. © Jeffrey Totaro.