Remove Civil Engineering Remove Construction Remove Permits Remove Structural Engineering
article thumbnail

Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

When starting a remodel or new construction project, an important early step is developing your budget to set realistic expectations and avoid surprises midway through the design process. This basic overview will help you understand the cost components of a residential construction project.

article thumbnail

Land Morphology and Olson Kundig update Oregon botanical garden

Deezen

In the second half of the 19th century, it became part of a sawmill that provided lumber for the construction of homes in Portland, according to the design team. It was long used as a hunting, fishing and camping site by native people.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Meet the Team: Who Works with an Architect on a Design Project?

DesignScape Architects

Whether you are designing a traditional home or your interests lie in large scale commercial buildings, you will find many different people involved in the construction process. From building contractors, civil engineers, and even interior designers — we’re here to help you find out exactly who works with an architect.

Project 52
article thumbnail

Insights: What do different engineers do, and when do I hire one?

Matt Fajkus Architecture

There are many different types of engineers involved in the building industry. While it’s best to hire an engineer when doing any type of construction, they are not always necessary. At their most basic function, structural engineers design the bones of a new building to resist forces caused by gravity and the elements.

article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Work is organized into three principle activities: 1) Design Development and Entitlement Processes ; 2) Site Development Permits and Construction Documents for Upper Garden Development ; and 3) eighteen months of construction. The first phase is approximately seven acres.

article thumbnail

Revitalizing a Contaminated Site: The Ford Calumet Environmental Center

Architizer

Working with our civil and plumbing engineers, we developed a design for an on-site black water treatment system where the outflow was clean water. The Ford Calumet Environmental Center is the first time a wastewater wetland system has been permitted by the City of Chicago.

Site 72
article thumbnail

Behind The Design 003: Canal House by The Ranch Mine

EntreArchitect

MPE Engineer, Structural Engineer, and Civil Engineer. Is that your preferred fee structure? Lump sum is our preferred fee structure made payable in 4 installments. What was the construction cost for the project presented? Describe the construction team for this project. Phoenix, AZ.

Mining 52